IESO Save on Energy · Peak Performance

Your buildings already
have the capacity. Q-Peak turns it
into revenue.

The aggregator platform behind Quwa's Ontario demand response portfolio. Forecast the peak, dispatch the curtailment, prove the savings, settle the payment — one system, from enrolment to cheque.

Live now · Toronto Hydro, Hydro Ottawa and Alectra territories

Event sequence
Ontario demand
Ontario Zonal Price
Peak risk · today
Season events called 3 / 12 max

Portfolios managed on Q-Peak

CBRE Portfolio Crown Property Management Portfolio JLL Portfolio Oxford Properties Portfolio Toronto Hydro LDC Hydro Ottawa LDC IESO Save on Energy
min
Baseline data resolution
IESO HVAC demand response methodology
days
Temperature-matched baseline
Closest four eligible days, same-day adjusted
/MW
Season performance rate
Set by the IESO program rate card
Events per season, capped
4 h maximum, weekdays only
The season, end to end

Five stages between an idle chiller
and a settled payment.

Every stage runs on the same record. The kW you enrol is the kW you baseline, the kW you shed and the kW you are paid for — no re-keying between spreadsheets.

q-peak / season 2026 Live
The platform

One console for the aggregator,
the owner and the operator.

Quwa runs the season. Portfolio owners see their money. Property managers see the four things they have to do on Thursday afternoon. Same data, three altitudes.

MT Quwa admin
Enrolled capacity
3.24MW
Across the managed portfolio
Event status
STANDBY
IESO-2026-E04 · 15:00–19:00
Committed this event
2.91MW
Commitments locked for the window
Season payout to date
$104k
3 events settled

Provincial demand · forecast vs actual

Peak risk 88%

Buildings requiring action

6 open
BuildingChecklistkW
Meridian Tower
Portfolio A
168
Northgate Plaza
Portfolio B
110
Harbourview Centre
Portfolio C
142
Parkway Centre
Portfolio C
74

Curtailable load by building

Registered

Asset register · Northgate Plaza

6 assets
AssetStrategykW
RTU-1 · RTU-4Setpoint +2 °C46
AHU-NorthPrecool 13:0028
Chiller CH-1Stage down21
Garage lightingNon-essential9
Common area LTGDim 30%6
HVAC share
84%
Assets modelled
375
Weather stations
6
BAS integrations
18

Event settlement · IESO-2026-E03

Settled
BuildingBaselineActualSavedPerf
Meridian Tower412238174104%
Harbourview Centre368221147103%
Northgate Plaza296168128116%
Northgate Plaza II301189112101%
Southpoint Business Park2141486669%

Where the money goes

Per MW
Season savings
10,854kW
Gross payment
$177k
Counted events
10of 12
Evidence files
96

Portfolio leaderboard · 2026 season

Avg performance
1Portfolio A95%
2Portfolio B88%
3Portfolio C81%
4Portfolio D74%

Performance rings

vs commitment
Top building
NORTHGATE
116% average
Events completed
3
Portfolio average
84%
Under 60%
2

Interface shown with representative buildings and season data for illustration. Actual portfolio composition and figures are visible only after sign-in.

Capabilities

Built around how the program
actually settles.

Multi-tenant portfolios

Client, building and asset hierarchy with scoped roles. An owner sees their whole portfolio; a property manager sees only the buildings assigned to them.

IESO-methodology baselines

Weather-normalised regression on 15-minute interval data, following the IESO HVAC demand response workbook. Every payment traces back to it.

Asset-level modelling

Every rooftop unit, air handler, chiller and lighting zone carries its own kW, curtailment strategy and comfort constraint.

Full event lifecycle

Standby, activation, completion — each state notified to the right people, with commitments locked per building before the window opens.

BAS action checklists

A per-building, per-asset instruction sheet an operator can execute without interpretation. Precool at 13:00, setpoint +2 °C at 15:00, restore at 19:00.

Settlement engine

Per-event and per-season settlement with the owner/aggregator split applied, weakest events dropped, and the underlying intervals attached.

Portfolio leaderboard

Performance ranked across clients and buildings so the conversation with an underperforming site starts with a number, not an opinion.

M&V evidence pack

Interval CSVs, baseline curves, event deltas and settlement statements — assembled in the form an auditor or an LDC actually asks for.

LDC and weather coverage

Buildings mapped to their local distribution company and nearest weather station, so temperature normalisation reflects the site, not the province.

The network

Aggregated across Ontario,
settled building by building.

Curtailment is pooled to meet the program commitment. Payment is attributed back to the individual building that delivered it.

Toronto Ottawa Mississauga Kitchener Hamilton Windsor

Local weather, local LDC,
one provincial commitment.

A Windsor rooftop unit and an Ottawa chiller do not behave the same way on a 34 °C afternoon. Q-Peak normalises each building against its own weather station and settles it against its own baseline, then rolls the result up into the portfolio commitment.

Selected

Toronto

StatusActive
LDCToronto Hydro

Hover a site to inspect. Coverage shown by LDC territory; portfolio composition is not published.

Revenue model

What a season is worth.

Peak Performance pays on the curtailment you actually deliver during called events, measured against your baseline. Move the sliders.

1,500 kW
Typically 8–15% of a commercial building's summer peak, almost all of it HVAC.
95 %
Delivered kW against committed kW, averaged over the counted events.
Estimated season payment
$0

across 13 buildings · about $0 per building

Performance payment$0
Gross program payment$0

The programme pays the aggregator; your share is agreed with Quwa and set out in your participation agreement.

Based on the 2026 Peak Performance rate card: $54,845 per MW season performance payment, up to 12 events of no more than 4 hours. Estimate only — actual settlement depends on your metered baseline, delivered curtailment and the events the IESO calls.

Why a platform

The program is winnable.
The paperwork is what loses it.

Season taskSpreadsheets and emailQ-Peak
Knowing what you can actually shedA number someone estimated in 2023Audited asset register, kW by unit
BaselineRebuilt by hand each eventWeather-normalised, stored, reusable
Standby noticeForwarded email chainNotified per building, commitment locked
What the operator does at 15:00A phone call, if it connectsPer-asset BAS checklist, timestamped
Proving the reductionInterval data reconciled after the factBaseline vs actual, per building, per event
Splitting the paymentA negotiationSettlement statement with the split applied
Questions

Before you enrol.

Not if it is planned. Most of the reduction comes from precooling before the window and letting the space drift within an agreed band during it, rather than shutting equipment off. Each asset in the register carries its own comfort constraint, and buildings can decline any individual event.

The program caps the season at 12 events of no more than four hours, on weekday afternoons in the summer season. In practice fewer are called. Performance is averaged over the counted events and the weakest are dropped, so one bad afternoon does not define the season.

15-minute interval consumption for the baseline period, an equipment list, and access to the building automation system in at least a read-only capacity. Quwa handles the LDC data request, the IESO enrolment forms and the measurement and verification.

The commitment is made at the portfolio level, which is the point of aggregating. A single site that misses its target is covered by the others; it simply earns less in the settlement, and shows up on the leaderboard with the interval data explaining why.

Yes. Portfolio owners get a scoped account covering every building they own, and property managers get accounts limited to the buildings assigned to them. Baselines, event results and settlement statements are all visible in the platform.

2026 season

Enrolment for the summer season
closes before the first heatwave.

Send us a building list and a year of interval data. We will come back with the curtailable capacity, the expected season payment and what it takes to enrol.